In places where surface wear resistance is extremely high, water-based epoxy super wear-resistant topcoat stands out with its excellent performance.
Environmentally friendly characteristics
Zero pollution guarantee: using water-based formula, no harmful organic solvent emissions during production, construction and use, providing safety for the indoor environment. Use in crowded places such as school playground stands and gymnasium floors will not threaten the health of students and athletes, creating a healthy and green sports and learning environment.
Environmental certification blessing: obtained a number of authoritative environmental certifications at home and abroad, such as the EU SGS environmental testing certification, proving that it has reached the international leading level in environmental performance and enhanced users' trust in the product.
Excellent performance
Super wear-resistant performance: through special formula and advanced production process, the coating has extremely high hardness and toughness. According to laboratory tests, its wear resistance is 3-5 times that of ordinary epoxy topcoat. In places with an average daily flow of tens of thousands of people, such as shopping malls and supermarkets, the floor using water-based epoxy super wear-resistant topcoat can still maintain good appearance and performance after 3-5 years of use, greatly reducing the frequency and cost of floor renovation.
Excellent stain resistance and easy cleaning: The dense coating structure effectively prevents stains from penetrating. Whether it is beverages, oil stains or other stains, it can be easily wiped clean with ordinary detergents and cleaning tools. In restaurant floor coating, facing common stains such as food residues and oil stains, the stain resistance of super wear-resistant topcoat makes floor cleaning simple and quick, improving the restaurant's sanitation environment and operating efficiency.
Excellent comprehensive performance: In addition to wear resistance and stain resistance, it also has good corrosion resistance, weather resistance and adhesion. In outdoor parking lots, the topcoat can keep the coating from fading and cracking under long-term exposure to sunlight, rain and vehicle rolling; in industrial workshops, it can always protect the substrate from damage in the face of various chemicals and mechanical wear, and closely bond with the substrate to ensure long-term and stable protection.
Construction specifications and key points
Strict substrate treatment: The substrate is fully treated before construction to ensure that there is no oil, dust or impurities on the surface. For concrete substrates, grinding and vacuuming are required to make the surface roughness reach a certain standard to enhance the adhesion of the coating; for metal substrates, rust removal and passivation treatment are required. For example, when constructing the floor of a large logistics warehouse, after the concrete base surface is ground, it is necessary to use a professional floor vacuum cleaner to thoroughly clean the dust, and then apply the primer to further seal the base surface and improve adhesion.
Accurate paint mixing: Accurately mix the paint according to the proportion specified by the product, and fully mix the main agent, curing agent and diluent. Pay attention to the stirring speed and time during the mixing process to avoid excessive bubbles. Generally, low-speed stirring is adopted, and the stirring time is controlled within 8-10 minutes. The prepared paint should be used up within the prescribed use time to avoid affecting the performance of the coating.
Multi-layer fine construction: Generally, a multi-layer construction process is adopted, including primer, intermediate reinforcement layer and topcoat. The primer plays the role of sealing the base surface and enhancing adhesion; the intermediate reinforcement layer can be scraped with quartz sand or troweled with epoxy mortar according to actual needs to increase the thickness and wear resistance of the coating; the topcoat gives the surface the final protection and decorative effect. The thickness and uniformity of each layer should be controlled, and the drying time between layers should be strictly controlled to ensure that the coating is fully cured. Generally, the drying time of the primer is 4-6 hours, the drying time of the intermediate reinforcement layer is 12-24 hours, and the drying time of the topcoat is 24-48 hours. The specific time should be adjusted appropriately according to the ambient temperature and humidity. After the construction is completed, the coating needs to be maintained. During the maintenance period, avoid the passage of people and vehicles. The maintenance time is generally about 7 days to ensure that the coating reaches the best performance.
